Skip to content
Now accepting Q2 projects — limited slots available. Get started →
繁體中文 Portugues 한국어 Espanol 日本語 Nederlands Francais 中文 العربية Deutsch English
Energy & EV Infrastructure
Station Locator MapsInstaller PortalsLead Generation

Desenvolvimento de Website para Empresas de Recarga EV

Seu Localizador de Estações Falha Antes dos Motoristas Encontrarem Seus Carregadores

< 1.2s
LCP Target
Map-heavy pages included
3x
Lead Increase
Average improvement
95+
Lighthouse Score
Performance baseline
0
Template Code
Everything custom-built
What EV Charging Website Development Actually Builds — And What It Replaces

Your station locator loads. A driver taps the map — it stutters, filters break, location permission fails. They close your tab and open PlugShare instead. EV charging website development rebuilds that moment: real-time availability feeds, connector-type filters (CCS, CHAdeMO, J1772, NACS), kW output sorting, and mobile geolocation that works the first time. Your site becomes the source of truth — not a redirect to a third-party app. We deliver headless CMS architecture so your team updates incentive guides and station specs without engineering tickets, API-first design so your mobile app and kiosk software pull from the same data layer, and dedicated conversion paths for fleet operators and site hosts. The difference: drivers book sessions through your platform, and B2B prospects see technical credibility that WordPress templates can't fake.

Onde os projetos falham

Station locator maps are slow, janky, or broken on mobile Drivers leave your site and find chargers through a competitor's app instead.
WordPress templates can't handle real-time OCPP data or API integrations Your engineering team burns months working around plugin limitations.
No dedicated portal for installers, fleet managers, or site hosts Partner onboarding stays manual, and your network grows slower than it should.
A generic website doesn't signal technical credibility to B2B prospects Utility companies and property developers go with competitors who look more established.
Lead forms are buried and conversion paths are unclear Site hosts and commercial prospects leave without ever submitting an inquiry.
Content about incentives, regulations, and station specs is outdated or missing entirely SEO traffic flows to competitors who keep their resource libraries current.

Conformidade

Interactive Station Locator

Mapbox-powered station finder with filtering by connector type, power level, availability, and network. Loads in under 800ms even with thousands of pins.

Real-Time Availability

OCPP and API integrations surface live charger status directly on your map. Drivers know which stations are available before they leave home.

Installer & Partner Portals

Authenticated dashboards for installation partners, site hosts, and fleet managers. Applications, documentation, and project status all in one place.

Lead Capture & Qualification

Multi-step forms segment inquiries by type — site host, fleet operator, residential customer, installer. Leads route to the right sales team automatically.

Incentive & Rebate Content Hub

Structured content sections for federal, state, and utility incentive programs. Schema markup targets featured snippets for high-intent searches.

Performance & Accessibility

95+ Lighthouse scores across all pages. WCAG 2.1 AA compliance keeps you covered for public utility and government contract accessibility requirements.

O que construímos

Station maps stutter on mobile and drivers bail to competitor apps

Your team ships station pages and incentive guides without code or dev tickets

WordPress plugins choke on real-time OCPP data and API integrations

Drivers filter chargers by CCS, CHAdeMO, J1772, Tesla, NACS, plus kW output in real time

No installer portal means partner onboarding stays manual and slow

Fleet operators and property managers hit dedicated ROI calculators and conversion paths

Generic templates signal weak technical credibility to utility buyers

Your site scales across regions with i18n architecture and localized content

Lead forms hide and commercial prospects leave without inquiring

Heatmaps show which station pages and map interactions convert qualified leads

Outdated incentive content bleeds SEO traffic to competitors

Your mobile app, kiosks, and partner platforms pull live data from clean REST/GraphQL endpoints

Nosso processo

01

Discovery & API Audit

We map your existing OCPP/API infrastructure, identify data sources for station information, and define user journeys for each audience — drivers, site hosts, installers, and fleet managers.
Week 1
02

UX Design & Map Prototyping

Interactive prototypes of the station locator, lead capture flows, and partner portal. We test map performance against your actual station dataset before writing a line of production code.
Weeks 2–3
03

Development & Integration

Next.js frontend, Supabase backend, Mapbox GL maps, and integrations with your charging network APIs. Every page hits 95+ Lighthouse scores.
Weeks 4–7
04

QA, Load Testing & Launch

We stress-test the map against your full station dataset, verify API failover behavior, cross-browser test across 20+ device configurations, and deploy to Vercel's edge network.
Week 8
05

Post-Launch Optimization

30 days of monitoring, performance tuning, and conversion rate optimization. We use real user data to refine map UX and lead capture flows.
Weeks 9–12
Next.jsReactMapbox GLSupabaseVercelTailwind CSSOCPP API Integration

Perguntas frequentes

Como funciona o mapa do localizador de estações?

Construímos mapas customizados em Mapbox GL que puxam dados de estações a partir de APIs compatíveis com OCPP ou seu banco de dados. Usuários podem filtrar por tipo de conector, nível de potência, disponibilidade e distância. Clustering e lazy-loading na rede edge do Vercel mantêm o mapa rápido mesmo com milhares de pinos.

Podem integrar com nosso sistema de gerenciamento de recarga existente?

Sim. Trabalhamos com OCPP 1.6/2.0, APIs REST de ChargePoint, Blink, EverCharge e backends customizados. Se seu CMS expõe dados de estações através de qualquer protocolo padrão, podemos integrá-los ao site em tempo real. Também construímos tratamento de failover para que o site permaneça funcional mesmo quando sua API fica offline.

Quanto tempo leva para construir um website de recarga EV?

A maioria dos projetos é entregue em 8–10 semanas. Um site de marketing básico com localizador de estações leva cerca de 6 semanas. Portais para instaladores, dashboards de frota ou integrações complexas de API levam de 10–12 semanas. Você recebe um cronograma detalhado após nosso sprint de discovery na primeira semana.

Vocês desenvolvem aplicativos móveis para empresas de recarga EV?

Focamos em plataformas web, mas nossa arquitetura API-first significa que o mesmo backend que alimenta seu website pode servir um aplicativo móvel nativo. Construímos endpoints REST e GraphQL limpos que seu time mobile — ou um parceiro que recomendamos — pode consumir diretamente, sem duplicar lógica de negócio.

E quanto a SEO para empresas de recarga EV?

Estruturamos cada página para busca — páginas de detalhe de estação com schema markup, guias de incentivos focando palavras-chave de alta intenção e landing pages por localização para buscas por cidade. Next.js oferece HTML renderizado no servidor que Google indexa imediatamente, diferente de frameworks single-page app.

O site consegue lidar com milhares de localizações de estações?

Absolutamente. Clustering de mapa, carregamento de dados baseado em viewport e cache de edge mantêm as coisas rápidas com 10.000+ estações. O mapa renderiza apenas o que está visível, permanecendo interativo independentemente do tamanho do dataset. Fazemos load-testing com seus dados completos durante QA para garantir tempos de resposta sub-segundo.

EV Charging Websites from $12,000
Fixed-fee. Station locator included. 30-day post-launch support.
See all packages →
Next.js DevelopmentCore Web Vitals OptimizationHeadless CMS DevelopmentCore Web Vitals & Jamstack Guide

Get Your Free EV Charging Site Assessment

Tell us about your charging network. We'll deliver a quote within 24 hours.

Get a Free Assessment
Get in touch

Let's build
something together.

Whether it's a migration, a new build, or an SEO challenge — the Social Animal team would love to hear from you.

Get in touch →