Skip to content
Now accepting new projects — limited slots available. Get started →
RFP Template · Web design

Web Design RFP Template (2026)

A web design RFP is a structured brief for vendors proposing the visual and experience layer of a website — typography, layout system, component library, and prototype. It is narrower than a full web development RFP because engineering is usually separate or downstream. The 2026 web design RFP template covers 9 sections including brand alignment, audience archetypes, competitive references, design system deliverables, and a structured evaluation rubric. Download the editable .docx, brief 3 design vendors, and pair the winning design proposal with a separate engineering RFP for build. This split-RFP pattern reduces total project risk versus a single design-and-build contract.

Best for: Design-led rebuilds, design system creation, prototype-first projects.

What to include in your web design RFP

  1. 01
    Brand context Brand guidelines, tone, current visual assets, brand pivots in flight.
  2. 02
    Audience archetypes 2-3 primary personas, their job-to-be-done on the site, devices they use.
  3. 03
    Competitive references 5 sites you admire and why — separate "what we want" from "what we do not want".
  4. 04
    Design deliverables Wireframes, hi-fi designs, prototype, design system (Figma library), handoff specs.
  5. 05
    Component scope Page templates, atoms, molecules — explicit count, not "comprehensive design system".
  6. 06
    Accessibility requirements WCAG 2.2 AA contrast, focus states, motion preferences, text-zoom behaviour.
  7. 07
    Timeline Discovery, concepts, refinement, design system. Typically 6-12 weeks.
  8. 08
    Budget range $15K-$50K is typical for marketing sites; $50K-$150K for product UX work.
  9. 09
    Evaluation criteria Weighted rubric — see below.

Scoring rubric (100 points)

Use this rubric to evaluate vendor responses. Weight each criterion by importance to your project. Total normalises to 100.

CriterionWeightWhat good looks like
Portfolio relevance 20 Three projects in your category with similar audience scale.
Design system thinking 15 Designer shows process not just outputs — tokens, scaling rules, dark mode.
Prototyping fidelity 10 Interactive Figma prototype, not just static screens.
Accessibility built-in 10 Contrast ratios, focus states, motion preferences in the design system.
Engineer handoff quality 10 Specs, tokens, component library structured for dev consumption.
Named senior designer 10 Lead designer is the one in the kickoff and the one in the handoff.
Revision rounds defined 10 Explicit number of revision rounds per phase, not unlimited.
References 10 Two clients to call.
Communication cadence 5 Weekly design reviews, async Figma feedback workflow.

Common web design RFP mistakes

  • Asking for free spec work — best designers will skip your RFP.
  • Unlimited revisions — kills timeline and quality; cap revisions per phase.
  • No handoff scope — leaves engineering team to interpret intent and budget overruns.
  • Hiring on Dribbble portfolios alone — pretty screens do not equal usable systems.
  • No accessibility requirement — leads to redesigns within 12 months when ADA complaints land.

Frequently asked questions

Should design and development be one RFP or two?

Two, in most cases. Splitting design from build lets you pick the best designer and the best engineer independently, reduces total risk, and gives you a usable design artifact even if the engineering vendor falls through.

How many design concepts should the RFP request?

One or two directions per page, refined through 2-3 revision rounds. Asking for 3+ concepts produces shallow work because vendors spread effort thinly.

What deliverables predict good engineer handoff?

A Figma library with tokens (colour, spacing, typography), named components, and documented variants. Without these, engineers re-interpret the design and visual fidelity drops 20-30% in build.

Procurement standards & guidelines

Authority references for web design procurement frameworks. Use these when your RFP needs to align with public-sector or industry standards.

Related RFP templates

Get in touch

Let's build
something together.

Whether it's a migration, a new build, or an SEO challenge — the Social Animal team would love to hear from you.

Get in touch →